What rooftop solar costs in India.
Short answer: turnkey C&I rooftop solar in India is typically quoted as a ₹-per-watt (₹/Wp) figure that falls as system size grows, and varies with roof type, mounting structure, component tier and site electrical work. There is no single honest number we can give you without seeing your roof and load profile — what follows is the framework for understanding what moves the price, plus an illustrative range for early budgeting conversations only.
What actually moves the cost per kW
| Driver | Effect |
|---|---|
| System size | Larger systems spread fixed costs (design, mobilisation, DISCOM liaison) across more capacity — cost per kWp generally falls as size increases, flattening past a few hundred kW. |
| Roof type | RCC flat roofs are typically cheapest to mount on. Metal/tin sheds need compatible clamping systems; weak or ageing roofs may need civil reinforcement first. |
| Mounting structure | Ground-mount needs a dedicated structure and more cable run than rooftop; fixed-tilt vs any tracking system changes both cost and yield. |
| Component tier | Module and inverter tier (Tier-1 vs otherwise), warranty length, and brand all affect price — and long-term reliability. |
| Electrical work | Cable run length, switchgear upgrades, and transformer/grid-interconnection requirements are site-specific and can be a meaningful share of total cost. |
| Inverter configuration | String vs central inverters trade off upfront cost against maintenance/monitoring granularity. |
Illustrative cost & payback, by facility size
Computed with the same model as our interactive calculator, assuming a debt-free cash purchase. Real numbers depend on your roof, tariff and a site survey — this is a starting reference, not a quote.
| Facility | Monthly bill | System size | Est. system cost | Est. annual savings | Payback | IRR |
|---|---|---|---|---|---|---|
| Small commercial (shop, clinic) | ₹50,000 | 51 kWp | ₹28,56,000 | ₹4,13,552 | 6.1 yrs | 18.6% |
| Mid-size commercial (office complex) | ₹2,00,000 | 205 kWp | ₹1,10,70,000 | ₹16,47,854 | 6.0 yrs | 19.1% |
| Mid-size factory | ₹4,50,000 | 461 kWp | ₹2,48,94,000 | ₹37,10,762 | 5.9 yrs | 19.1% |
| Large factory | ₹10,00,000 | 1,024 kWp | ₹5,32,48,000 | ₹82,72,146 | 5.7 yrs | 19.8% |
| Large home | ₹15,000 | 15 kWp | ₹9,00,000 | ₹1,22,798 | 5.9 yrs | 19.2% |
Pricing last reviewed October 2026. System sized to cover ~120% of consumption at 1,250 kWh/kWp/year; residential figures include the PM Surya Ghar subsidy (capped ₹78,000), commercial/industrial figures exclude the separate 40% accelerated-depreciation tax benefit (see subsidies & policy).
Quick ratio, if you just want a ballpark
If you only know your average monthly electricity bill and want a number in your head, not a table: at a typical commercial/industrial blended tariff of about ₹11/kWh, system cost works out to roughly 55 times your monthly bill in rupees (around 57× for smaller systems under ₹1 lakh/month, settling to about 53× above ₹10 lakh/month, since cost per kW falls at scale), and annual savings works out to roughly 8.2 times your monthly bill. So a ₹3,00,000/month bill ballparks to roughly ₹1.65 crore in system cost and roughly ₹24.6 lakh a year in savings. System size needed comes out to roughly 102–103 kWp per ₹1 lakh of monthly bill.
Payback and IRR barely move with size — across commercial, industrial and residential system sizes in the examples above, payback stays in a narrow 5.7–6.1 year band and IRR in an 18–20% band, because both are themselves ratios of cost to savings, and that ratio is close to constant once a system is debt-free and the tariff assumption holds.
This ballpark assumes a ~₹11/kWh blended tariff (30% of the bill fixed/demand charges, the rest variable) and the same debt-free, no-subsidy-beyond-residential assumptions as the table above — a facility on a very different tariff slab will scale differently. For an exact number from your own bill, use the calculator or call the public estimate API we publish for exactly this purpose.
How to read a quote
- Ask what's included: is civil/structural work, switchgear, cabling, and DISCOM liaison in the ₹/Wp figure, or billed separately?
- Ask what's excluded: taxes, transportation, any roof repair identified during survey.
- Ask for the component brands and warranty terms, not just the tier label.
- A quote without a site assessment behind it is an estimate, not a number to plan a capex budget around.
Common questions
Why does cost per kW go down as system size goes up?
Fixed costs — site mobilisation, design, DISCOM liaison, project management — spread across more capacity. A 1 MW system typically costs less per kWp than a 50 kW system, though the gap narrows past a few hundred kW.
Does roof type change the cost?
Yes. RCC flat roofs are usually cheapest to mount on. Metal/tin sheds need compatible clamps and sometimes structural reinforcement. Weak or ageing roofs may need civil work before installation — a real cost driver that only shows up in a site assessment.
Is ground-mount cheaper than rooftop?
Ground-mount avoids roof-specific constraints but adds land cost (or opportunity cost of using land), a dedicated mounting structure, and usually more cabling run — it isn't automatically cheaper, it depends on your site.
What ongoing costs come after installation?
O&M (cleaning, monitoring, preventive maintenance), inverter replacement typically around year 12–15, and insurance if you choose it. These are real, budgeted costs across the system's life — not zero.